Desert Services :
LBS (Location Based Services) in desert conditions as :
- Geological Mapping
- Environmental Mapping
- Hydrogeological Mapping
- Field Services in Desert Conditions
- Data Acquisition for Lab Analyses
- Environmental Studies
- Desert Consultancy
- Field Supervision of Desert Projects

Welcome to our site!
We at Er-Petro believe that we should bring together East and West, North and South by
bringing European and Hungarian technologies to North Africa and the Middle-East.
Therefore you will find state-of-the-art technologies proposed to various parts of Africa,
into the desert or to the rural, industrialised towns.
We are the link for you

Industrial Services:
- Technological Piping Works
- Water, Oil and Gas Pipeline Services
- Thermal Insulation and Cladding Works
- Water Supply Projects
- Design and Construction of Water Treatment Plants
- Instrumentation and Automation Services

- Special High-Risk Services
- Commercial Diving
- Industrial Alpinist Services

Er-Petro Ltd.
Head Office
Hungary 2040 Budaörs
Petőfi Sándor Street 60
Phone numbers:
(+ 36) 23 415 075
Fax number:
(+ 36) 23 416 119
E-mail:
mail@er-petro.hu
Our Actual Project – Power Plant’s Chimney Overhaul – 2014
The North & South Stock had been finished ahead of schedule.
We are looking forward to the next Stack project.
Libyan Iron and Steel Company – Asbestos Abetement Project – 2013
Finally in 2013 April our Asbestos Abetement Service Project have started and after 9 months Er-Petro Ltd. finished the work and handed over the “Asbestos Safe” (Certificates by: Wessling Hungary, Wessling Germany) Power and Desalination Plant to the Libyan Iron and Steel Company.
The project main goal was to change the Asbestos Containing Material (ACM) pipe insulation,Turbine covering and motor covering to a more safer material.
Our company’s first policy is the quality of our work, that we hand over to the customer.
We were working under safe working procedures,following every steps of the regulations when dealing with ACM.
The project included :
A complete Power Plant (consists of 6 Turbine and Boiler Units) and a complete Desalination Plant with 3 Evaporator Units.
The project declared in 250 days split to 2 Phases
– Phase One (Power Unit 1-2-3 and Desalination Boilers,Evaporators and the Elevated Common System Lines) 100 days
– Phase Two (Power Unit 4-5-6) – 150 days
At the end, both of the customer and our company was statisfied with the results of the abetement project.